Register Now
  • Days
  • Hours
  • Minutes
  • Seconds
  • Home
  • Pre-Summit Plant Visits
  • Awards Presentation
  • Programme Schedule
  • Contesting Companies
  • Participation Fee
  • Downloads
    • NPS 2025 Report
  • Contact Us  
Register Now

All Posts By admin

This author has written 28 articles
Home admin

Innovative Burr Removal Green Technology For Piston Ring

  • March 13, 2015
  • admin
  • 2012, Award Winners, Case Studies
  • 0 Comments

Project initiation date: 02/10 Challenge Burr problem was observed at customer end during first time development & supplies of Oil Ring with Nodular Cast Iron (Ductile) for prestigious American customers. 24 nos. found during sample inspection of P/N 7N7078 &…

Read More→

Single Piece Flow/Moving Line for Building Injection Molding Machines (IMMs)

  • March 13, 2015
  • admin
  • 2012, Award Winners, Case Studies
  • 0 Comments

Project initiation date: 04/11 Challenge Chinese entry into Indian Market created a severe competition in the plastics processing industry. Chinese machines were offered at 20-30% lower prices and the delivery time was only the shipping time i.e., 4 weeks (1…

Read More→

Optimizing metal process – Elimination of hazardous waste generation in motorcycle fuel tank painting process.

  • March 13, 2015
  • admin
  • 2012, Award Winners, Case Studies
  • 0 Comments

Project initiation date: 06/2009 Challenge Hazardous sludge generation Conventional pretreatment technology of zinc phosphate (trication) leads to generation of phosphate sludge as by-product & since it contains heavy metals, the sludge is treated & disposed as hazardous waste. High energy…

Read More→

Productivity Improvement In Plastic Paint Shop

  • March 13, 2015
  • admin
  • 2012, Award Winners, Case Studies
  • 0 Comments

Project initiation date: 05/2010 Challenge To meet the projected customer demand of painted 5000 sets/day (April’ 11) against the present capacity of 2900 sets/day (March’ 10) Data Collection OEE Losses data was collected by TPM methodology to evaluate the present…

Read More→

Roll forming in spigot type weld screws

  • March 13, 2015
  • admin
  • 2011, Award Winners, Case Studies
  • 0 Comments

Project initiation date: Sep’09 Challenge The generic process flow for spigot type weld screw consists of (1)Raw material (2) Forging(3) Spigot machining (4) Threading (5) Heat treatment (6) Surface finishing (7) Pack & dispatch. This product has a unique entry…

Read More→

Productivity improvement by resolving quality problem in Lub oil pump assembly

  • March 13, 2015
  • admin
  • 2011, Award Winners, Case Studies
  • 0 Comments

Project initiation date: July 2010 Challenge Delivery commitments getting failed due to the rejection of the pumps after assembly Used bar chart & ABC analysis for identification of the problem.

Read More→

Innovative Up gradation of Pegard CNC Boring machine

  • March 13, 2015
  • admin
  • 2011, Award Winners, Case Studies
  • 0 Comments

Project initiation date: Aug 2009 Challenge Pegard CNC Horizontal Boring m/c commissioned in the year 1983 (29 years old). Problem was selected to improve Productivity, to improve maintainability, to improve Process capability and to improve internal customer satisfaction. Tools like…

Read More→

Reduction of Frame Body boring bar change over time for 6 models thru SMED

  • March 13, 2015
  • admin
  • 2011, Award Winners, Case Studies
  • 0 Comments

Project initiation date: 20.10.10 Challenge Weld shop Machine wise production data collect Last six month Avg. (Mar-Aug-10) Fine Boring production is less (25/Shift) then other Machine’s

Read More→

Design by Edit process to enhance Design Productivity

  • March 13, 2015
  • admin
  • 2011, Award Winners, Case Studies
  • 0 Comments

Project initiation date: 02/09 Challenge Problem was selected to reduce design lead time, Design variability & deviations due to design. As per annual business plan (ABP) number of projects to be executed from 113projects/Year (2007-08) to planned 200 projects /…

Read More→

Productivity Improvement in Medium voltage (11 Kv to 33 Kv) Vacuum Circuit Breaker manufacturing line

  • March 13, 2015
  • admin
  • 2011, Award Winners, Case Studies
  • 0 Comments

Project initiation date: 01/10 Challenge Circuit Breaker is the sub-assembly for the main product – The Switchgear panel. Every customer order is considered as a project of “switchboard” which consists of a number of interconnected switch gear panels. The size…

Read More→
  • 1
  • 2
  • 3

Indian Machine Tool Manufacturers' Association
10th Mile, Tumkur Road,
Madavara Post Bangalore - 562 123
Phone: 080 - 66246600
www.imtma.in

Abhishek - Mob : 9844294387, abhishek@imtma.in
Madan - Mob : 7899437625, madan@imtma.in
Prashant - Mob : 9916855765 , prashant.k@imtma.in

  Facebook   Linkedin   Instagram   Youtube
Privacy Policy | Contact Us
© IMTMA. - All Rights Reserved
  • Login/Registration